Video & Articles: Appliance & Equipment RepairCarrier/Gree ETAC Heat Pump Terminal Block Replacement 42011103

Carrier/Gree ETAC Heat Pump Terminal Block Replacement 42011103

05:44
This video provides step-by-step instructions for replacing the terminal block on a Carrier/Gree ETAC Heat Pump Unit. The most common reason for replacing this part is if the unit is not power on.

All of the information in this video is applicable to the following brands: Carrier, Gree

Step By Step Instructions

1
To replace a terminal block in this carrier/gree etac heat pump unit…
2
… you will need a #2 phillips-head screwdriver, a short #2 phillips-head screwdriver, and needle-nose pliers.
3
Before you begin the procedure, be sure to turn the unit off…
4
…and disconnect the power supply.
5
Remove the unit’s front panel by pulling the bottom of the panel out to release it from the tabs…then lift up.
6
Use the #2 phillips-head screwdriver to unthread the screw securing the control panel.
7
Detach the control panel.
8
Now unthread the lower right screw securing the junction box cover.
9
Unthread the three screws securing the junction box itself.
10
Pull back the cover to fully detach the junction box from the power cord.
11
Disconnect the power cord wire connecter.
12
Next, unthread the six screws securing the control box’s side access cover.
13
Remove the cover.
14
Use the short #2 phillips-head screwdriver to unthread the mounting screw to release the terminal block you’re replacing – if you’re replacing the inner terminal block, you may need to remove the oute
15
Lift up the wire insulators.
16
Note the orientation of the wires… then use the needle-nose pliers to depress the locking tabs to release the wires.
17
To install the new terminal block…
18
… attach the wires to the appropriate terminals and slide the insulators over the terminals.
19
Align the block on the bottom panel of the control box and thread the mounting screw.
20
Realign the side access cover…
21
… and thread the screws to secure.
22
Reconnect the power cord wire connecter…
23
… then reposition the junction box and rethread the screws.
24
Rethread the lower right screw to fully secure the cover.
25
Realign the control panel and thread the screw to secure.
26
Reinstall the front panel by aligning the tabs over the top rail then push the bottom of the panel in until it snaps into place.
27
Restore power to the unit…
28
… and the etac heat pump system should be ready for use.
Description
This video provides step-by-step instructions for replacing the terminal block on a Carrier/Gree ETAC Heat Pump Unit. The most common reason for replacing this part is if the unit is not power on.

All of the information in this video is applicable to the following brands: Carrier, Gree
Step-By-Step Instructions
1
To replace a terminal block in this carrier/gree etac heat pump unit…
2
… you will need a #2 phillips-head screwdriver, a short #2 phillips-head screwdriver, and needle-nose pliers.
3
Before you begin the procedure, be sure to turn the unit off…
4
…and disconnect the power supply.
5
Remove the unit’s front panel by pulling the bottom of the panel out to release it from the tabs…then lift up.
6
Use the #2 phillips-head screwdriver to unthread the screw securing the control panel.
7
Detach the control panel.
8
Now unthread the lower right screw securing the junction box cover.
9
Unthread the three screws securing the junction box itself.
10
Pull back the cover to fully detach the junction box from the power cord.
11
Disconnect the power cord wire connecter.
12
Next, unthread the six screws securing the control box’s side access cover.
13
Remove the cover.
14
Use the short #2 phillips-head screwdriver to unthread the mounting screw to release the terminal block you’re replacing – if you’re replacing the inner terminal block, you may need to remove the oute
15
Lift up the wire insulators.
16
Note the orientation of the wires… then use the needle-nose pliers to depress the locking tabs to release the wires.
17
To install the new terminal block…
18
… attach the wires to the appropriate terminals and slide the insulators over the terminals.
19
Align the block on the bottom panel of the control box and thread the mounting screw.
20
Realign the side access cover…
21
… and thread the screws to secure.
22
Reconnect the power cord wire connecter…
23
… then reposition the junction box and rethread the screws.
24
Rethread the lower right screw to fully secure the cover.
25
Realign the control panel and thread the screw to secure.
26
Reinstall the front panel by aligning the tabs over the top rail then push the bottom of the panel in until it snaps into place.
27
Restore power to the unit…
28
… and the etac heat pump system should be ready for use.

Applicable Product Model

Parts Needed
Total$0.00

Related Articles & Videos

08:46
Part Replacement
Carrier/Gree ETAC Heat Pump Ambient Temperature Sensor Replacement 3900012123
10:01
Part Replacement
Carrier/Gree ETAC Heat Pump Outdoor Coil Temperature Sensor Replacement 390000372
08:31
Part Replacement
Carrier/Gree ETAC Heat Pump Indoor Coil Temperature Sensor Replacement 390000596
10:24
Part Replacement
Carrier/Gree ETAC Heat Pump Solenoid Coil Replacement 4300040022
12:27
Part Replacement
Carrier/Gree ETAC Heat Pump Indoor Fan Motor Replacement 1501180211